If you buy a new home today, expect to wait about three and a half years. On 3 November 2026, the typical home for sale on WiserChat was listed for handover 42 months away. Only 945 of 24,282 homes were ready to move into, and 3,331 were listed for handover within a year. The wait depends a lot on the developer. Rock, La Vista and Memaar Al Morshedy had homes ready now. Palm Hills, Madinet Masr and ORA had none, and most of their homes were listed four years or more away.
One thing before the table
These are the dates each home is listed for today, not a promise kept or broken. WiserChat keeps today's date, not a history of the dates developers promised before, so we cannot tell you who delivered late.
One date needs a warning. 6,993 homes were listed exactly 48 months away, which is November 2030. In 100 projects every single home carries that same date. That looks like a placeholder, not a real handover plan. Leave those projects out and the typical wait drops from 42 to 36 months. Where a developer's figure leans on such a project, the table says so.
Developer by developer
Homes for sale on WiserChat on 3 November 2026, and when they are listed for handover.
| Developer | Homes for sale | Ready now | Within a year | Typical wait | Note |
|---|---|---|---|---|---|
| Saudi Egyptian Developers | 1,246 | 2 | 954 | 2 months | Il Latini's 814 homes all carry one date |
| City Edge | 1,441 | 1 | 1,327 | 10 months | Latin City (570) and Mazarine (344) each carry one date |
| Memaar Al Morshedy | 152 | 42 | 33 | 1 year | |
| La Vista | 119 | 42 | 6 | 1.5 years | |
| Rock | 328 | 140 | 0 | 1 year 8 months | |
| Misr Italia | 64 | 5 | 2 | 2.5 years | |
| SODIC | 1,272 | 66 | 98 | 3 years | |
| Better Home | 895 | 2 | 0 | 3 years | |
| Mountain View | 579 | 3 | 81 | 3 years | Jirian's 180 homes all at 48 months |
| PRE | 53 | 3 | 6 | 3 years | |
| Marakez | 291 | 0 | 26 | 3.5 years | |
| Orascom | 489 | 2 | 9 | 3.5 years | |
| M Squared | 212 | 0 | 4 | 3 years 8 months | |
| Tatweer Misr | 793 | 99 | 9 | 4 years | Salt North Coast's 340 homes all at 48 months |
| Hyde Park | 301 | 5 | 10 | 4 years | Hyde Park Signature's 43 homes all at 48 months |
| Palm Hills | 2,202 | 0 | 0 | 4 years | Jirian Palm Hills' 460 homes all at 48 months |
| Al Ahly Sabbour | 524 | 0 | 0 | 4 years | At East and Youd, 324 homes, all at 48 months |
| Taj Misr | 1,141 | 0 | 16 | 4 years | De Joya 4 and De Joya New Zayed, 1,125 homes, all at 48 months |
| Gates | 712 | 0 | 291 | 4 years | Lyv Caesar's 377 homes all at 48 months |
| ORA | 26 | 0 | 0 | 4 years | Every home at 48 months |
| Madinet Masr | 2,801 | 1 | 12 | 4.5 years | Talala's 902 homes all listed for November 2031 |
What the table tells you
If you need to move in soon, the list is short. Rock had 140 homes ready (126 of them in Rock Eden), Tatweer Misr 99 (all in Bloomfields, Mostakbal City), SODIC 66 (48 in VYE), La Vista 42 and Memaar Al Morshedy 42. Most of the big names had almost nothing ready.
"Within a year" can be one date for a whole project. Saudi Egyptian Developers and City Edge look fast because three large El Alamein projects carry a single date for every home. Il Latini's page shows January 2027 for all 814. That may be right. Still, ask which building your home is in and when that building is due.
"Four years" often means "date not known". Palm Hills, Al Ahly Sabbour, Taj Misr, Gates and ORA all land on 48 months because big projects of theirs carry that one date. Leave those projects out and Palm Hills drops to about 44 months and Al Ahly Sabbour to 36. ORA has no other date to show: every one of its 26 homes for sale is listed at 48 months.
Madinet Masr is the longest wait. Its 2,801 homes were typically listed 54 months away. Talala alone has 902 homes listed for November 2031. Its long plans, up to 15 years, match that.
Two developers people ask about
M Squared or La Vista, which is closer to delivery? On 3 November 2026, La Vista: 42 of its 119 homes were ready and the typical wait was about a year and a half. M Squared had none ready and a typical wait of about 3 years 8 months.
Dar Al Alamia. WiserChat lists three projects: Acasa in the Fifth Settlement, marked partly handed over, with no homes for sale; Acasa Mia, marked not started; and Acasa Alma in the Sixth Settlement, under construction. Together they had 13 homes for sale, listed two to four years away, and 8 of them at exactly 48 months. We found no record of Dar Al Alamia's past promised dates, so we cannot say whether it delivered on time.
How to check a delivery date yourself
- Ask for the date in the contract, not the brochure. The contract date is the one you can hold the developer to.
- Ask what happens if it is late. Read what the contract says the developer owes you if the date slips, before you sign.
- Visit a project the developer has already handed over. See if people live there, and ask the owners how late it was.
- Check the date per building. In a big project, different phases deliver years apart.
How we did the sums
Figures are WiserChat's homes for sale with a price on 3 November 2026: apartments, duplexes, penthouses, studios, villas, townhouses, twin houses and chalets. Each home's handover date is the one its listing shows that day, counted in months from now. "Typical wait" is the middle value per developer, rounded. "Ready now" means the listing shows no wait. The table covers the largest developers and the ones buyers ask about most. A developer's older, finished projects often have no homes for sale left, so they do not appear here.
Tell Wiser when you need to move in, and it will show you the homes listed for handover by then, with the developer and the plan.