Nobody can give you an honest on-time score for SODIC, because the handover date promised for each project and the date owners actually got their keys are not published side by side. WiserChat does not have that pair either. What it has is the record of what SODIC has handed over, and that record is long. On 3 November 2026, of the 24 SODIC projects on WiserChat, 8 had been handed over in full and 10 in part. SODIC has 1,272 homes for sale on WiserChat, from about EGP 9.7 million, with the typical one at about EGP 25.6 million. 66 of them are ready to move into now.
So with SODIC you can still buy a finished home from the developer, not only a promise. The rest of this page shows what is finished, what is for sale, and how to check the date for the home you want.
What SODIC has handed over
WiserChat's research marks a project as handed over when there is evidence that homes were delivered and people live or work there. The status of each SODIC project was last checked between 26 and 30 October 2026.
| Status | Count | Projects |
|---|---|---|
| Handed over in full | 8 | Allegria, Casa, Westown Residences, The Polygon and Beverly Hills in Sheikh Zayed; Eastown and Kattameya Plaza in New Cairo; October Plaza in 6th of October |
| Handed over in part | 10 | VYE SODIC and The Estates in New Zayed; SODIC East in New Heliopolis; Villette in New Cairo; Caesar and June in Ras El Hekma; SODIC West, Six West, Westown Medical Center and Westown The Portal in Sheikh Zayed |
| Being built | 1 | Ogami in Ras El Hekma |
| Not started | 4 | Eastvale in Mostakbal City, Karmell New Zayed, Allegria Residence in 6th of October, One 16 in Sheikh Zayed |
| No status yet | 1 | The Courtyards in Sheikh Zayed |
The finished record sits mostly in Sheikh Zayed, where SODIC's older compounds are. Its newer cities are a mix: VYE, The Estates, SODIC East and Villette have residents and still sell new phases.
Most of what SODIC sells today is in projects that are at least partly handed over. Of the 1,272 homes for sale, 563 are in 8 partly handed over projects, 216 are in Ogami, which is being built, and 493 are in Eastvale and Karmell New Zayed, which have not started.
What SODIC sells now
These are the 11 SODIC projects with homes for sale on WiserChat on 3 November 2026. "From" is the cheapest home and "typical" is the middle price. The handover is the earliest listed for a home in the project. The plan columns show the lowest down payment and the longest plan on offer, which are not always the same plan.
| Project | Area | Homes | From (EGP) | Typical (EGP) | Earliest handover | Lowest down | Longest plan |
|---|---|---|---|---|---|---|---|
| VYE SODIC | New Zayed | 277 | 11.7M | 21.4M | Ready now | 0% | 10 years |
| Eastvale | Mostakbal City | 255 | 9.7M | 19.9M | Nov 2029 | 5% | 9 years |
| Karmell New Zayed | New Zayed | 238 | 10.2M | 22.0M | Dec 2026 | 0% | 10 years |
| Ogami | Ras El Hekma | 216 | 18.8M | 31.2M | Oct 2028 | 5% | 8 years |
| Caesar | Ras El Hekma | 119 | 27.5M | 46.7M | Jul 2027 | 5% | 8 years |
| SODIC East | New Heliopolis | 70 | 15.0M | 28.0M | Ready now | 0% | 10 years |
| June | Ras El Hekma | 67 | 25.2M | 34.5M | Apr 2027 | 0% | 10 years |
| The Estates | New Zayed | 14 | 39.2M | 53.3M | Ready now | 0% | 10 years |
| Villette | New Cairo | 12 | 29.2M | 41.6M | Ready now | 0% | 10 years |
| SODIC West | Sheikh Zayed | 3 | 122.9M | 141.9M | Jan 2027 | 10% | 10 years |
| Six West | Sheikh Zayed | 1 | 44.3M | 44.3M | Jan 2027 | 10% | 10 years |
The cheapest way in is a two-bedroom apartment in Eastvale at about EGP 9.7 million. The cheapest one-bedroom is in Karmell New Zayed at about EGP 10.2 million, and the cheapest three-bedroom is also in Karmell at about EGP 16.2 million.
If you want to move in soon
66 SODIC homes are listed as ready now: 48 in VYE SODIC, 12 in Villette, 5 in The Estates and 1 in SODIC East. Another 341 are listed for handover within two years, by November 2028, so 407 in total. If the date matters more than the price, start with these.
One thing to ask about Karmell
WiserChat's research marks Karmell New Zayed as not started, yet 10 of its homes are listed for handover in December 2026. The other 228 are listed from April 2028 to October 2030. Both cannot be right. If you look at Karmell, ask the sales office which phase your home is in and what has been built on it.
How to check "on time" for yourself
- Get the date in writing. The handover date in the contract for your exact home is the one that counts. Ask what the contract says if it slips: the grace period and any compensation.
- Ask about the last phase. In VYE, SODIC East or June, ask when the previous phase was promised and when it was handed over.
- Talk to owners. Visit a handed over compound such as Allegria or the finished part of SODIC East and ask two owners what date they were promised and when they got their keys.
- Look at the site. For Ogami, Eastvale or Karmell, go and see what is built.
- Prefer ready if timing is the risk. A ready home removes the delivery question. You pay for that in price and in shorter plans.
How we counted
Figures are from WiserChat's project data on 3 November 2026. A home for sale is one listed and not marked sold, reserved or withdrawn, with a price in Egyptian pounds; offices, shops and clinics are left out. Prices are asking prices, not a quote for a specific home. Handover status comes from WiserChat's own research into delivered homes and residents. It does not say whether a handover was on the promised date.
Tell Wiser your budget and the date you need the keys, and it will show you which SODIC homes fit.